Self-levelling screeds are commonly used in Essex renovation projects to create smooth, flat floors ready for new finishes. Proper preparation is essential to ensure strong bonding and long-term durability.
1) Inspect and repair the subfloor
Check the floor carefully for cracks or unstable areas.
- Concrete surfaces may need grinding to remove weak layers.
- Loose tiles should be secured or removed.
- Timber floors require a rigid board system before screed installation.
Repair all defects before applying levelling compound.
2) Clean and apply primer
Thoroughly remove dust, grease, paint, and adhesives. Apply the correct primer depending on whether the surface is absorbent or sealed.
3) Edge strips and level guides
Install perimeter foam strips and mark the finished height with levelling guides.
4) Pour and cure
Mix the levelling compound accurately, pour evenly across the floor, and roll with a spiked roller to remove trapped air. Leave the screed undisturbed for at least 24 hours.
Why choose Floor Screeding Essex?
Floor Screeding Essex offers reliable screeding services across Essex with careful preparation and professional workmanship.